Camera
Every progress photo lines up with the last.
Last week’s photo sits faintly over the camera, so you step into the same pose and distance every time. Front, side and back, with a timer when you need it.
Progress photo app for iPhone, iPad and iPhone Duo
One photo a week, lined up with the last. Log your weight and measurements, compare any two weeks, and keep every photo private. No account.
Coming soon to the App Store
Camera
Last week’s photo sits faintly over the camera, so you step into the same pose and distance every time. Front, side and back, with a timer when you need it.
Compare
Scrub back through every week on the timeline, or wipe a slider between two photos. Put them side by side, or stitch them into one card to share.
Progress
Log weight, waist, chest, hips and your own measurements beside every photo. Each number gets its own chart, kept in step with Apple Health.
Why Shapen
Apple Intelligence estimates it from your photo, with a likely range. Made for following the trend, not a measurement.
A short, kind note after every entry, written on your iPhone. It never sees your photos or sets calorie targets.
Days to goal, your weight trend and before and after on your Home and Lock Screens.
“Log a photo in Shapen.” Log, compare or hear from Coach without opening the app.
Privacy
No account and no Shapen server. Your photos stay on your iPhone, and in your own iCloud if you turn on sync.
Open the app and start. There’s nothing to sign up for and nothing to log in to.
Optional sync uses your own private iCloud, so iPhone and iPad stay in step.
The body fat estimate sends a photo to Apple’s Private Cloud Compute, which works it out and keeps nothing. A photo taken in clothes is never sent.
Coach runs on the device with Apple Intelligence and reads only your saved numbers.
App Lock with Face ID, blurred photos, blank screenshots and discreet app icons.
iPhone Duo
Open it and your before sits on one half, your after on the other. Stand it half-folded and it becomes its own tripod for the weekly photo.
Pricing
The weekly photo diary, free to download. No account and no adverts.
Coming soon
Everything
Monthly, yearly or once. Skip it at setup and you still get four weeks of Pro, free.
Coming soon
Guides
Body recomposition rarely shows on the scale. The signs that it’s working, how long change takes to measure, and how to track it without guessing.
Why the scale isn’t moving even though your waist is shrinking: daily water swings, the weekly weight rhythm, glycogen and muscle, and what to track instead.
Weekly progress photos beat daily selfies. Why once a week is enough to see body recomposition, and how to pick a day you can repeat.
FAQs
Everything to know before your first photo.
Once a week is enough. Same day, same time, same light. Weekly photos show change that daily ones hide, and Shapen can remind you.
Yes. There’s no Shapen account and no Shapen server. Photos are saved on your iPhone and, if you turn on sync, in your own iCloud. One feature, the body fat estimate, sends a photo to Apple’s Private Cloud Compute to work out the estimate, and Apple keeps nothing.
Use the same spot, the same light and the same clothes each week. Shapen shows a faint outline of last week’s photo in the camera, so you can step into the same pose and distance every time.
Losing fat and building muscle at the same time. The scale can stay almost flat for weeks while your body changes, which is why photos and measurements tell you more than weight alone.
Yes. The weekly photo diary is free to download. Shapen Pro adds Compare, the body fat estimate, Coach and iCloud sync, as a subscription or a one-off purchase.
iPhone and iPad with iOS 27 or later, including iPhone Duo. The body fat estimate and Coach use Apple Intelligence, so they need a device that supports it.
No. Coach runs on your iPhone with Apple Intelligence and reads only your saved numbers. It writes a short, kind note and never sets calorie targets or diet rules.
It’s an estimate, not a measurement. Treat it as a trend: the same pose and light each week make the line meaningful. For a clinical number, use a DEXA scan.
Coming soon to the App Store, free for iPhone and iPad. Shapen Pro adds Compare, the body fat estimate, Coach and iCloud sync.
Coming soon to the App Store